Quick answer
For your first Straight task, do not change many settings: run defaults once, then adjust one item at a time. Straight depends on length/width/electrical/install.
Why it matters
Change one variable at a time so you know which setting matters.
Length.
Step by step
- Check stairs/type/electrical/door/user/width.
- Separate equipment/install/electrical/door/maintenance.
- Get 2-3 quotes; confirm type/install/warranty.
- Contract states scope/electrical/payment/warranty.
Common mistakes
- Equipment price only, not install/electrical.
- Ignoring stairs/door/width.
- Not checking rental/warranty.
- No payment/maintenance terms.
Checklist
- Stairs/type/electrical/door/user.
- Equipment/install/electrical/door/maintenance.
- Width/turns/safety/permits.
- Warranty/payment/contract.
- Budget/rental/resale.
Key facts
- Length.
- Width.
- Electrical.
FAQ
How do I start with Straight?
For your first Straight task, do not change many settings: run defaults once, then adjust one item at a time. Straight depends on length/width/electrical/install.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Angi